ION L4-2.4L (2007)
2. Connect the engine harness electrical connectors (2) to the ECM.
3. Connect the body wiring harness electrical connector (3) to the ECM.
4. Connect the negative battery cable.
5. Program the ECM. Refer to Control Module References. See: Testing and Inspection/Programming and Relearning