ION L4-2.4L (2007)
37. Cut two 6.1 m (20 ft) deployment wires from a 0.8 mm (18 gage) or thicker multi-strand wire. These wires will be used to fabricate the passenger
deployment harness.
38. Strip 13 mm (0.5 in) of insulation from both ends of the wires.
39. Twist together one end from each of the wires in order to short the wires.
40. Twist together the 2 connector wire leads from the high circuits from both stages of the I/P module to one set of deployment wires. Refer to SIR
Connector End Views in order to determine the correct circuits.
41. Inspect that the 3-wire connection is secure.
42. Bend flat the twisted connection.
43. Secure and insulate the 3-wire connection to the deployment harness using electrical tape.
44. Twist together the 2 connector wire leads from the low circuits from both stages of the I/P module to one set of deployment wires. Refer to SIR
Connector End Views in order to determine the correct circuits.
45. Inspect that the 3-wire connection is secure.