ION L4-2.4L (2007)
5. Remove the battery cable ground nut (1) from the stud on the side rail.
6. Remove the negative battery cable ground terminal (2) from the stud.
7. Remove the negative battery cable ground.
Installation Procedure
1. Install the negative battery cable ground.
2. Install the negative battery cable ground terminal (2) to the stud.
Notice: Refer to Fastener Notice.
3. Install the battery cable ground nut (1) to the stud on the side rail.
Tighten the nut to 20 N.m (15 lb ft).