L200 L4-2.2L VIN F (2002)
5. Install right side console extension.
6. Allow evaporator core to soak for 15 minutes.
IMPORTANT: The 5 minute drying time is an important step in curing the cooling coil coating to the evaporator.
7. Dry evaporator by:
^
Adjusting temperature to full hot
^
Adjusting mode to heater only
^
Turning RECIRC On
^
Making sure A/C button is Off
^
Open windows 1/2 in. and close doors
^
Start engine and allow to reach operating temperature
^
Allow blower motor to operate on HI blower for 5 minutes once engine reaches operating temperature.
8. Properly dispose of cooling coil coating runoff collected in drain pan into a sanitary drain.
9. Remove protective coverings from interior of vehicle.