L200 L4-2.2L VIN F (2002)
3. Perform the entire charge procedure through the low side pressure service port on the suction pipe.
4. Following these procedures will prevent accidental high side vehicle system pressure being subjected to the charging station in the event an error is
made in valve closing sequence during compressor operation to pull in the R-134a charge.