Coolant Line/Hose Replacement for L300 V6-30L VIN R
2. Install return hose to block fitting clamp at 1 o'clock position.
3. Install return hose to surge tank clamp at 2 o'clock position.
4. Install engine wiring harness into retainer clip and snap closed.
5. Ty-rap engine harness to return hose.
6. Connect negative battery cable.
Torque:
Battery Terminal Bolts: 17 Nm (13 ft. lbs.)
7. Fill cooling system.
8. Use fresh water to rinse away any coolant that was spilled during service.