L300 V6-3.0L VIN R (2001)
3. Position suction liquid line rearward of wiring harness at front of dash with oxygen sensor harness behind lineset.
NOTE: Use only mineral oil to lubricate O-rings. Use of PAG oil will cause premature corrosion of joint.
IMPORTANT: Always install new O-rings to prevent refrigerant leaks.
4. Remove shipping caps from thermal expansion valve (TXV) and suction/liquid line assembly.
5. Lubricate suction/liquid line assembly to TXV O-rings.
6. Position suction/liquid line assembly to TXV and hand start bolt.
Torque:
Suction/Liquid Line Assembly-to-TXV Bolt: 7 N.m (62 in-lbs)
7. Remove shipping cap from suction/liquid line assembly and from liquid line.
8. Add any PAG oil that was removed during recovery to liquid line.
IMPORTANT: Always install new seal washers to prevent refrigerant leaks.
9. Install seal washer and install suction/liquid line assembly to liquid line and hand start nut.
Torque:
Suction/Liquid Line-to-Liquid Line: 12 N.m (9 ft-lbs)