saturn Workshop Repair Guides

Saturn Workshop Service and Repair Manuals

Procedures|Page 2980 > < Procedures|Page 2978
Page 4
background image

6. Install glove compartment bin to I/P with fasteners.

Torque:
Glove Compartment Bin-to-I/P Fasteners: 2.5 N.m (22 in-lbs)

7. Install right side heater outlet with retainer to glove compartment bin.

8. Install right side lower I/P closeout panel (hush panel) with retainers.
9. Operate glove compartment lamp and glove compartment door to ensure proper operation.

Procedures|Page 2980 > < Procedures|Page 2978