LW2 V6-3.0L VIN R (2000)
1. Install and position return hose to surge tank fitting and block fitting.
2. Install return hose to block fitting clamp at 1 o'clock position.
3. Install return hose to surge tank clamp at 2 o'clock position.
4. Install engine wiring harness into retainer clip and snap closed.
5. Trap engine harness to return hose as shown.
6. Connect negative battery cable.
^
Torque: 17 Nm (13 ft. lbs.)
7. Fill cooling system. (Refer to "Coolant Replacement".)
8. Use fresh water to rinse away any coolant that was spilled during service.