saturn Workshop Repair Guides

Saturn Workshop Service and Repair Manuals

All Technical Service Bulletins for Hose/Line HVAC: > < Campaign - A/C Discharge Line Bolt/Seal Replacement|Page 2126
Page 20
background image

23.

Install right front lower splash shield bolts.

Torque:

Right Splash Shield-to-Body

Bolts: 5 Nm (44 in-lbs)

24.

Lower vehicle.

25.

Connect oxygen sensor connector and route wiring into clips.

26.

Install battery heat shield.

27.

Connect negative battery cable.

Torque:

Battery Terminal Bolt: 17 Nm (13 ft-lbs)

28.

Evacuate, recharge, and leak check the A/C system.

IMPORTANT:

Do not cover any existing underhood labels when affixing Campaign Completion Label.

29.

Affix Campaign Completion Label on a clean and dry surface of radiator core support, in an area clearly visible when hood is raised. (For more
information, refer to "Campaign Completion Label" in this bulletin.)

All Technical Service Bulletins for Hose/Line HVAC: > < Campaign - A/C Discharge Line Bolt/Seal Replacement|Page 2126