LW2 V6-3.0L VIN R (2000)
1. Route shift lock control solenoid wires through opening in control assembly.
2. Insert wire terminals into connector body.
3. Position solenoid to control assembly and install solenoid pop rivet with a rivet gun.
4. Install automatic transaxle control assembly.
5. Enable the Restraint Systems.