saturn Workshop Repair Guides

Saturn Workshop Service and Repair Manuals

Procedures|Page 19771 > < Procedures|Page 19769
Page 4
background image

2. Install the luggage carrier cross rails to the luggage carrier.
3. Install the luggage carrier cross rail screws to the luggage carrier.

NOTE:  Refer to Fastener Notice in Service Precautions.

Tighten the screws to 2 N.m (18 lb in).

4. Apply masking tape to all attaching areas of the roof.

5. Measure 140 mm (5.512 in) in from the right rear edge of the roof.
6. Measure 35 mm (1.378 in) in from the right side rear edge of the roof.
7. Use the measurements as a location for the right rear luggage carrier attaching hole.
8. Align the assembled luggage carrier to the right rear luggage carrier.
9. With help from an assistant, install the luggage carrier to the roof, retaining the location of the right rear edge measurement.Ensure that the

luggage carrier is equally spaced to all sides of the roof.

10. Tape the luggage carrier to the roof in order to retain the location of the luggage carrier to the roof.
11. Use the luggage carrier as a template for locating the drill locations for the attachment of the side rails to the roof.

IMPORTANT:  Ensure that the rack is properly located since there are clearance holes in the roof structure immediately under the luggage carrier
attaching holes.

12. Clearly mark the location of the attaching holes.

13. With help from an assistant, remove the luggage carrier from the roof.

IMPORTANT:  Remove and install the luggage carrier as an assembled luggage carrier.

14. Use a 4 mm (9.016 in) drill bit in order to drill pilot holes at the marked locations.

IMPORTANT:  Ensure that the drill depth is carefully controlled. Failure to do so may result in drilling through the headliner panel. You may have
to remove the headliner panel before drilling the holes.

15. Check the clearance between the pilot holes and the clearance holes in the roof structure immediately under the luggage carrier pilot holes.
16. Use a 10 mm (0.39 in) drill bit in order to drill out the pilot holes at the marked locations of the attaching holes.
17. Remove the tape from the roof.

Procedures|Page 19771 > < Procedures|Page 19769