RELAY AWD V6-3.5L VIN L (2006)
1. Install the ball stud (2) to the control arm.
Tighten the ball stud to 12 Nm (106 inch lbs.).
2. Install the automatic level control sensor link (1) to the ball stud.
3. Lower the vehicle.
4. Install the ELC/TRAILER fuse.