Sky L4-2.0L Turbo (2008)
14. Install the negative battery cable terminal (3) to the stud.
15. Install the negative battery cable ground nut (4) to the side rail stud.
Tighten the nut to 10 N.m (89 lb in).
16. Install the positive battery cable (1) to the battery.
17. Tighten the positive battery cable nut.
Tighten the nut to 17 N.m (13 lb ft).
18. Close the positive battery cable connection cover.
19. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection (See: Service and Repair) .