Sky L4-2.4L (2007)
5. Install new O-ring seals over the transmission fluid cooler pipes.
6. Insert the transmission fluid cooler pipes into the transmission.
Notice: Refer to Fastener Notice.
7. Install the bolt (1) securing the transmission fluid cooler pipe retainer (2) to the transmission.
Tighten the bolt to 25 N.m (18 lb ft).
8. Install the front closeout panel.
9. Lower the vehicle.
10. Inspect the transmission fluid level. Refer to Transmission Fluid Checking.
11. Inspect for fluid leaks.