SL L4-1.9L SOHC VIN 8 (1997)
CAUTION: The top ring is thinner than the second ring. The top ring is symmetrical and can be installed with either side up. The second ring has
a pip mark which must be installed with the pip mark up. Do not align the ring gaps. Each ring should be rotated 90 to 120 degrees from each other
around the piston.
3. Install bearings:
a. Install the upper bearing in the connecting rod. Apply a small amount of oil to the bearing surfaces and piston rings.