SL L4-1.9L SOHC VIN 8 (1997)
13. Install instrument panel pad/reinforcement assembly.
IMPORTANT: Make sure wiring harnesses and instrument panel junction block are in position.
14. Install and torque nut and bolts.
Torque: 10 N.m (89 in-lbs)
15. Connect antenna cable at lower right side of instrument panel reinforcement.