saturn Workshop Repair Guides

Saturn Workshop Service and Repair Manuals

Deployment Outside Vehicle - Steering Wheel Module, I/P Module, and Roof Rail Module|Page 9802 > < Deployment Outside Vehicle - Steering Wheel Module, I/P Module, and Roof Rail Module|Page 9800
Page 3
background image

16. Twist together the 2 connector wire leads from the low circuits from both stages of the steering wheel module, to one set of deployment wires.

Refer to SIR Connector End Views in order to determine the correct circuits.

17. Inspect that the 3-wire connection is secure.

18. Bend flat the twisted connection.

19. Secure and insulate the 3-wire connection to the deployment harness using electrical tape.

20. Connect the deployment harness to the connector on the steering wheel module.

Deployment Outside Vehicle - Steering Wheel Module, I/P Module, and Roof Rail Module|Page 9802 > < Deployment Outside Vehicle - Steering Wheel Module, I/P Module, and Roof Rail Module|Page 9800