VUE FWD L4-2.4L (2008)
7. Apply thread sealant (Saturn P/N 21485277) Loctite(TM) 242 threadlocker, or equivalent, to sensor threads.
8. Install the ECT sensor.
Tighten the ECT sensor to 18 N.m (13 lb ft).
9. Connect the ECT sensor harness connector. Push in the connector until a click is heard, then pull back to confirm a positive engagement.
10. Install the battery. Refer to Battery Replacement (Without LAT-2.4L) (See: Starting and Charging/Battery/Service and Repair/Battery
Replacement)Battery Replacement (With LAT-2.4L) (See: Starting and Charging/Battery/Service and Repair/Battery Replacement) .
11. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection (With LAT-2.4L) (See: Starting and
Charging/Battery/Battery Cable/Service and Repair)Battery Negative Cable Disconnection and Connection (Without LAT-2.4L) (See: Starting
and Charging/Battery/Battery Cable/Service and Repair) .
Tighten the battery terminal bolt to 17 N.m (13 lb ft).
12. Fill the coolant. Refer to Cooling System Draining and Filling (Static Fill) (See: Service and Repair)Cooling System Draining and Filling (GE
47716 Fill) (See: Service and Repair) .