VUE FWD L4-2.4L Hybrid (2007)
59.
With the aid of an assistant, lift the generator battery carrier up onto the studs.
60.
Install the generator battery carrier nuts.
Tighten
Tighten the nuts to 25 N.m (18 lb ft).
61.
Connect the body wiring harness electrical connector to the generator battery disconnect control module pigtail.
62.
Install the 36-volt positive battery cable leads.
63.
Install the 36-volt positive battery cable lead nut.
Tighten
Tighten the nuts to 9 N.m (18 lb in).
64.
Install a NEW 36-volt positive battery cable lead nut. Start the nut finger-tight, and then torque to the specification given.
Tighten
Tighten the nuts to 15 N.m (11 lb ft).
65.
Position the 36-volt positive battery cable retainer to the fan cover.
66.
Install the 36-volt positive battery cable retainer bolt.
Tighten
Tighten the bolt to 8 N.m (71 lb in).
67.
Install the 36-volt negative battery cable ground nut.
Tighten
Tighten the nut to 9 N.m (80 lb in).
68.
Install the generator battery cover bolt.
Tighten
Tighten the bolt to 10 N.m (89 lb in).
69.
Tilt the load floor rear compartment cover towards the rear of the vehicle slightly in order to insert the tabs into the battery tray rear support.
70.
Set the load floor rear compartment cover down, ensuring that the retaining clips align to the proper locations, carefully push down, securing the
cover.
71.
Return both rear seat backs to their proper positions.
72.
Connect the 12-volt negative battery cable.
73.
Reprogram the ECM with the latest calibrations if a P1A5A DTC was stored with the P1A59 DTC.
74.
After programming, clear any DTC codes that may be present.
Important:
Hybrid parts are no longer on restriction through TAC. All hybrid parts can now be ordered through your parts department.
Important:
For U.S. Retailers: Hybrid battery cassette replacement was recently covered in the October Emerging Issues Seminar (10207.10D). An
archived copy of this training seminar should be stored on your Genesis IDL Box. It is also available on the GM Training Website
(www.gmtraining.com). This training seminar highlights BDU and hybrid battery cassette replacement. Once this video is loaded to the GM
Training Website and you log in, you will be able to take the following path to locate and view the October Emerging Issues Seminar