VUE FWD L4-2.4L Hybrid (2007)
3. Install the generator battery temperature sensor wiring harness terminals to the battery terminals.
4. Position and install the generator battery cable leads (1-4) to the battery terminals.
5. Install NEW tie straps in order to secure the battery cables to the generator battery temperature sensor wiring harness.
Notice: Refer to Fastener Notice.
6. Install the generator battery cable nuts (1-4) to the batteries.
Tighten the nuts to 8 N.m (71 lb in).