VUE FWD L4-2.4L Hybrid (2007)
14. Place a NEW terminal block seal onto the generator control module.
15. Unsecure, position and install the 36-volt terminal block to the generator control module.
16. Install the 36-volt terminal block nuts (1) to the generator control module.
Tighten the nuts to 10 N.m (89 lb in).
17. Install the 36-volt positive battery cable nut (2) to the generator control module.
Tighten the nut to 10 N.m (89 lb in).
18. Install the 12-volt positive battery cable nut (5) from the generator control module.
Tighten the nut to 10 N.m (89 lb in).
19. Install the generator control module 3-phase cable nuts at the generator control module.
Tighten the nuts to 8 N.m (71 lb in).