VUE FWD L4-2.4L Hybrid (2007)
7. Install the generator battery terminal covers.
8. Connect the generator battery temperature sensor wiring harness electrical connectors to the battery temperature sensors in the following order:
*
1
*
2
*
3
7. Install the generator battery terminal covers.
8. Connect the generator battery temperature sensor wiring harness electrical connectors to the battery temperature sensors in the following order:
*
1
*
2
*
3