VUE FWD L4-2.4L Hybrid (2007)
5. Connect the body wiring harness electrical connector (1) to the ECM.
6. Connect the negative battery cable.
7. Install the generator battery control module cover.
8. Program the ECM. Refer to Programming and Relearning. See: Testing and Inspection/Programming and Relearning