VUE FWD L4-2.4L Hybrid (2007)
17. Route the deployment harness out of the driver side of the vehicle.
18. Disconnect the seat belt pretensioner-RF connector.
19. Cut the seat belt pretensioner connector out of the vehicle, leaving at least 16 cm (6 in) of wire at the connector.
20. Strip 13 mm (0.5 in) of insulation from each of the connector wire leads.
21. Cut two 6.1 m (20 ft) deployment wires from a 0.8 mm (18 gage) or thicker multi-strand wire. These wires will be used for the seat belt