VUE FWD L4-2.4L Hybrid (2007)
Tighten the nut to 50 N.m (37 lb ft).
5. Lower the vehicle.
6. Install the negative battery cable (2) to the positive battery cable retainers (1).
7. Install the negative battery cable (1) to the stud.
8. Install the negative battery cable nut (2) to the left front wheelhouse panel (3) stud.
Tighten the nut to 10 N.m (89 lb in).
9. Install the battery tray.