VUE FWD V6-3.5L (2008)
9. Connect the primary brake pipe outlet fitting (1) at the brake delay valve.
Tighten the fitting to 18 N.m (13 lb ft).
10. Tighten the primary brake pipe fitting at the master cylinder pressure sensor mounting block.
Tighten the fitting to 18 N.m (13 lb ft).
11. Connect the brake delay valve electrical connector (1).
12. Install the underhood electrical center. Refer to Underhood Electrical Center or Junction Block Replacement (See: Maintenance/Fuses and Circuit
Breakers/Fuse Block/Service and Repair/Underhood Electrical Center or Junction Block Replacement) .
13. Bleed the hydraulic brake system. Refer to Hydraulic Brake System Bleeding (Manual) (See: Brake Bleeding/Service and Repair)Hydraulic Brake
System Bleeding (Pressure) (See: Brake Bleeding/Service and Repair) .