VUE FWD V6-3.6L Hybrid (2009)
13. Install the HV dc APM terminal fasteners (1) utilizing a magnetic socket. Tighten the terminal fasteners to 9 Nm (80 lb in).
Note: A service replacement PIM does not have the hybrid cooling surge tank stud installed. Install the stud when replacing the PIM.
14. Install the hybrid cooling surge tank stud (2), if necessary. Tighten the stud to 9 Nm (80 lb in).
15. Install the coolant pipe hoses (1), if necessary.
16. Install a new PIM cover seal (3).
Note: DO NOT use excessively abrasive cleaning tools on the sealing surface. Hand sanding with wet 400 grit sandpaper or use of a hand scraper
is recommended.
17. Clean the sealing surface of the PIM cover as necessary.
18. Position the PIM cover (2) onto the PIM ensuring the seal remains in place.