xA L4-1.5L (1NZ-FE) (2006)
c. Install the 4 screws.
5. INSTALL HEATER CONTROL KNOB
a. Install the 3 heater control knobs.
6. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH
7. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH
8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
9. PERFORM INITIALIZATION
a. Perform initialization.
NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.