xB L4-2.4L (2AZ-FE) (2009)
(b) Connect the hood lock control cable.
(c) Install the hood lock assembly with the 3 bolts.
Torque: 7.5 Nm (76 kgf-cm, 66 in-lbf)
4. INSPECT HOOD SUB-ASSEMBLY See: Adjustments
5. ADJUST HOOD SUB-ASSEMBLY See: Adjustments
6. INSTALL WATER HOSE CLAMP BRACKET
(a) Install the water hose clamp bracket with the 2 bolts.
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)
7. INSTALL RADIATOR COVER
(a) Install the radiator cover with the 5 clips.
8. INSTALL FRONT FENDER LINER LH