xB L4-2.4L (2AZ-FE) (2009)
HINT: Use the same procedure as for the RH side.
50. INSTALL FRONT DOOR SCUFF PLATE RH
(a) Engage the 10 claws and install the front door scuff plate.
51. INSTALL FRONT DOOR SCUFF PLATE LH
HINT: Use the same procedure as for the RH side.
52. INSTALL REAR SEATBACK ASSEMBLY RH See: Seats/Service and Repair/Rear Seat Assembly (for RH Side)/Installation
53. INSTALL REAR SEATBACK ASSEMBLY LH See: Seats/Service and Repair/Rear Seat Assembly (for LH Side)/Installation
54. INSTALL REAR SEAT CUSHION WITH COVER PAD SUB-ASSEMBLY See: Seats/Service and Repair/Rear Seat Assembly (for LH
Side)/Installation
55. INSTALL DECK FLOOR BOX RH
(a) Install the deck floor box with the 2 nuts.
Torque: 18 Nm (184 kgf-cm, 13 ft-lbf)
56. INSTALL DECK FLOOR BOX LH
(a) Install the deck floor box with the 2 nuts.
Torque: 18 Nm (184 kgf-cm, 13 ft-lbf)
57. INSTALL REAR DECK FLOOR BOX
(a) Install the rear deck floor box.