xB L4-2.4L (2AZ-FE) (2009)
Variable Valve Timing Actuator: Service and Repair
Installation
2AZ-FE ENGINE CONTROL SYSTEM: CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY: INSTALLATION
2AZ-FE ENGINE CONTROL SYSTEM: CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY: INSTALLATION
1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY
(a) Apply a light coat of engine oil to the O-ring on the camshaft oil control valve assembly.
(b) Install the camshaft oil control valve assembly with the bolt.
Torque: 9.0 Nm (92 kgf-cm, 80 in-lbf)
(c) Connect the camshaft oil control valve assembly connector.
(d) Install the vacuum hose clamp with the bolt.
Torque: 8.5 Nm (87 kgf-cm, 75 in-lbf)
2. INSTALL OUTER COWL TOP PANEL
(a) Install the cowl top panel outer with the 10 bolts.
Torque: 6.0 Nm (61 kgf-cm, 53 in-lbf)