xB L4-2.4L (2AZ-FE) (2009)
7. INSTALL AIR CONDITIONING UNIT
(a) Install the 3 bolts.
Torque: 9.8 Nm (100 kgf-cm, 87 in-lbf)
HINT: Tighten the bolts in the order shown in the illustration.
(b) Install the air conditioning unit with the bolt and nut.
Torque: 9.8 Nm (100 kgf-cm, 87 in-lbf)
8. INSTALL INSTRUMENT PANEL WIRE
(a) Connect the connectors.
(b) Engage the clamps.