t
| Propshaft tubes are marked with a spot of white or green paint in the flanges. |
–
| When bolting propshaft tubes together, line up spots of paint, dot to dot. |
–
| If flanges of propshaft tubes are to be removed, first transfer spots of paint to tube. |
This will ensure that imbalance present will be kept to a minimum in the entire propshaft. |
Installing centre bearing free of stress |
–
| Align centre bearing in its elongated holes so that propshaft is under stress. |
–
| Do not tighten centre bearing bolts to body until after propshaft has been installed. |
|
|
|