Leon Mk2
Installation |
Note
t | Sun blind cross strut must be fitted before installation of sun blind housing. |
t | Do not grease sun blind slide and sun blind cables. |
– | Push sun blind housing -2- together with sun blind steel strap -3- in direction of -arrow- into assembly frame -1-. |
– | The guides of the sun blind housing must be pushed onto assembly frame -1- precisely -arrows-. |
Note
When doing so, make sure that the blind material is not damaged. |
– | Push sun blind slide -1- in direction of -arrow- into sun blind cross strut -2-. |
Note
Ensure that sun blind slide -1- engages in cut-out of sun blind steel strip -6- and in follower of sun blind cable -5-. |
The remaining installation steps are carried out in the reverse sequence. |
– | Connect cover -2- to assembly frame -4- so that engages correctly. |
Tighten bolt -3-, tightening torque: 2 Nm. |
– | Correctly position sun blind housing -1-. |
Tighten bolt -2-, tightening torque: 3.5 Nm. |
Note
t | After installing the roller blinds, this must be checked for synchronous run and if it is running properly. |
t | Fort his purpose, the roller blind can be moved by hand on sun blind motor using a commercially available hexagon key. |
t | Watch out for folding and warping of the sun blind material. |
– | Install moulded headliner → General body repairs, interior; Rep. gr.70. |
– | Install rear glass panel → Chapter. |
– | On completion of all work, carry out normalisation run for sun blind motor → Chapter. |