–
| In area of hole -E- check gap between noise insulation mat and floor panel (noise insulation mat must not make contact with installed condensate drain valve -C-). |
–
| Check condensate drain valve -C-; it must not be gummed up with wax or underseal. |
–
| Check for contamination of condensate drain hose -B- and clean hose before fitting. |
|
|
|