t
| The Climatronic control unit -J255-/Air conditioning control unit -J301- sends a signal along the comfort data bus to the engine control unit, depending on the pressure calculated in the refrigeration circuit, while the compressor is activated, to request a higher refrigerant ventilator speed. The request calculated by the Climatronic control unit -J255-/Air conditioning control unit -J301- is displayed on the measurement values block → Vehicle diagnostic, testing and information system VAS 5051. |
t
| Currently, the request for a higher refrigerant ventilation speed is sent for the following duty cycle: |
t
| Pressure in the refrigerant circuit lower than approx. 9 bar (6 bar when the pressure was more than 9 bar) without requirement. |
t
| Pressure in the refrigerant circuit higher that approx. 9 bar (6 bar) to approx. 20 bar, depending on the pressure of 30 to 100 % of the requirement. |
t
| Pressure in the refrigerant circuit higher than approx. 20 to 100 % of the requirement. |
t
| The signal generated by the High pressure sender -G65- may also be used for engine management. The control and indication panel Climatronic control unit -J255-/Air conditioning control unit -J301- sends the information over the comfort system data bus to the engine control unit (the torque required for compressor operation depends on the pressure in the refrigeration circuit). Depending on engine control unit version, signal is displayed as duty cycle in measurement value block → Vehicle diagnostic, testing and information system VAS 5051 |
|
|
|