The O-rings -2- are supplied with the replacement drying element. |
–
| Remove the O-rings -2-from the sealing bolt -1-. |
–
| Moisten the O-rings with refrigerant oil using a lint-free cloth and clean the thread of the bolt -1- and of the reservoir -4-. |
–
| Moisten the new O-rings with refrigerant oil and fit them to the sealing bolt. |
–
| Insert the drying element -3- into the reservoir as far as it will go. The upper part has a spring. |
–
| Fit the sealing bolt. Tightening torque: 15 Nm. |
–
| Fill the refrigerant circuit. |
|
|
|