seat Workshop Repair Guides

SEAT Workshop Service and Repair Manuals

Roller chain: Removing and fitting, engine code letters AZQ, BME and BXV . > < Adjust distribution timing, engine codes AZQ, BME and BXV
Adjust the distribution timing, engine code BBM
   
Adjust the distribution timing, engine code BBM
Special tools and workshop equipment required
t  Torque wrench kit -SAT 8010-
t  Fastening bolt -T10120-
t  Counterhold tool -T10121-
t  Counterhold tool -T20018B-
t  Support -U 30025E-

Operation process
–  Remove distribution chain → Chapter.
–  Tighten the fastening bolt for the crankshaft notched pulley to the maximum on the crankshaft.
   
–  Remove the Hall sender -G40--arrow-.
  N15-0520
–  Turn the crankshaft with the securing bolt of the pulley in engine rotation direction until the aperture for the Hall sender -G40- shows the slot of the camshaft.
  N15-0606
–  The fastening bolt -T10120- should be inserted easily in the camshaft.
  N15-0607
–  Release the fastening bolt-2- from the camshaft pinions -1-, using the counterhold -T20018B-.
  E15-10057
–  Turn the crankshaft in the direction of engine rotation, using the pulley fastening bolt, until the counterhold -T10121- can fit into the aperture of the engine speed sensor -G28-.
  N15-0598
–  Tighten the fastening bolt-2- for the camshaft pinion -1- to 20 Nm, using the counterhold -T20018B-.
–  Then tighten the bolts -2-1/4 turn (90 °).
–  Remove the counterholds from the camshaft and the flywheel.
–  Turn crankshaft two full turns in engine D.O.R. and check valve timing again → Chapter.
Further assembly is basically the reverse of the dismantling sequence.
  E15-10057

Roller chain: Removing and fitting, engine code letters AZQ, BME and BXV . > < Adjust distribution timing, engine codes AZQ, BME and BXV