–
| Unscrew bolts -2, 5- and -arrows-. |
–
| Lay the electric lines and hoses on the left air duct pipe free using the lever -80 200-. |
–
| Loosen hose clip -3- and detach air pipe (left-side). |
Note -Items 1 and 4- can be disregarded. |
Installation is carried out in reverse order, noting the following: |
–
| First start all securing bolts on charge air pipe. Then tighten. Tightening torque: → Item. |
Replace damaged cable ties and clips. |
|
|
|