Installation is carried out in the reverse order. When installing, note the following: |
Caution When doing any repair work, especially in the engine compartment, pay attention to the following due to the cramped conditions: |
t
| All the various lines (e.g. fuel, hydraulic system, active carbon filter system, coolant, refrigerant, brake fluid and vacuum pipes and hoses) and electrical wiring must be installed in their original positions. |
t
| To avoid damage to lines, ensure sufficient clearance to all moving or hot components. |
|
Vehicles with manual gearbox: |
–
| Check clutch release bearing for wear and renew if necessary. |
–
| Lightly lubricate clutch release bearing, release bearing guide sleeve and splines on input shaft with grease for clutch plate splines -G 000 100-. |
Continuation for all vehicles: |
–
| Check whether dowel sleeves for centring engine/gearbox have been fitted in cylinder block, insert if necessary. |
|
|
|