Beginning of injection: check and adjust dynamically |
Note! t
| The dynamic checking and testing of the start of injection are only possible in function 04 “Engine basic setting”. |
t
| The start of the injection should always be checked and be adjusted if necessary, after replacing the toothed belt and after having loosened the bolted joints on the injector pump or the toothed belt wheel. |
Special tools and workshop equipment required |
|
|
|