Installation is carried out in the reverse order; note the following: |
Caution When doing any repair work, especially in the engine compartment, pay attention to the following due to the cramped conditions: |
t
| All the various lines (e.g. fuel, hydraulic system, active carbon filter system, coolant, refrigerant, brake fluid and vacuum pipes and hoses) and electrical wiring must be installed in their original positions. |
t
| To prevent damaging the hoses, ensure that all mobile or hot components are easily accessible. |
|
–
| Check clutch release bearing for wear and renew if necessary. |
–
| Lubricate clutch release bearing, guide sleeve for release bearing and splines of input shaft with a small quantity of G 000 100. |
–
| Check whether the dowel sleeves for centring engine/gearbox are in the cylinder block, install if necessary. |
|
|
|