SEAT Workshop Service and Repair Manuals
HOME
FEATURES
MENU
INDEX
ABOUT US
Removing and installing balance shaft for inlet camshaft >
< Balance shaft timing chain - exploded view
Leon Mk2
Power unit
4 cylinder Injection engine (2.0l, 4V Direct injection, turbocharger and chain control)
Engine cylinder head, valve gear / Chain drive
Balance shaft timing chain: Removing and installing
Balance shaft timing chain: Removing and installing
Balance shaft timing chain: Removing and installing
Removing:
–
Remove timing chain cover (top)
→ Chapter
.
–
Remove timing chain cover (bottom)
→ Chapter
.
–
Remove distribution chain
→ Chapter
.
–
Remove guide rail for camshaft timing chain
-1-
.
–
Remove chain tensioner for camshaft timing chain
-3-
.
–
Remove the balance shaft chain tensioner
-1-
.
–
Remove tensioning rail
-2-
.
–
Remove guide rail
-3-
.
–
Remove guide rail
-4-
.
–
Remove timing chain.
Installing:
l
Tightening torques
→ Chapter
–
Turn idler gear/balance shaft to markings
-arrows-
.
Note
Due to the ratio, the markings only align after every 7th turn.
–
Fit timing chain; the timing chain links with coloured markings must be positioned at the markings on the chain sprockets.
–
Fit tensioning rail for timing chain and tighten bolt
-2-
.
–
Fit guide rail for timing chain and tighten bolts
-4-
.
–
Fit guide rail for timing chain and tighten bolts
-3-
.
–
Insert chain tensioner of timing chain
-1-
with locking fluid
→ ETKA (electronic parts catalogue)
.
–
Check the setting again.
–
Check markings on idler gear/balance shaft
-arrow-
.
Note
For illustration purposes, the markings on the idler gear/balance shaft are shown with the chain removed.
Further assembly is basically the reverse of the dismantling sequence.
Power unit
4 cylinder Injection engine (2.0l, 4V Direct injection, turbocharger and chain control)
Engine cylinder head, valve gear / Chain drive
Balance shaft timing chain: Removing and installing
Removing and installing balance shaft for inlet camshaft >
< Balance shaft timing chain - exploded view