–
| Insert coolant pump -3- in cylinder block and install securing bolts -4- together with rear toothed belt guard. |
–
| Tighten securing bolts -4- to 20 Nm and -1- to 10 Nm. |
–
| Install idler roller -6- and tighten securing bolt -5- to 50 Nm. |
Installing toothed belt and adjusting valve timing → Chapter. |
|
|
|