Inspecting the injection rate, tightness and jet formation of the injectors |
Special tools and workshop equipment required |
t
| Remote control, e.g. -V.A.G 1348/3A- |
t
| Adapter, e.g. -V.A.G 1348/3-2- |
t
| Digital potentiometer, e.g. -V.A.G 1630- |
t
| Measuring tool set, e.g. -V.A.G 1594 A, B oder C- |
t
| Hand multimeter, e.g. -V.A.G 1602- |
l
| Fuel temperature 15…20°C, fuel must be according to the valid standards |
–
| If necessary remove engine cover with air filter → Chapter. |
–
| Remove fuel rail together with installed injectors → Chapter. The fuel hoses remain connected. |
Testing jet formation and tightness |
–
| Disconnect plug at coolant temperature sender -G62- → Chapter. |
|
|
|