Special tools and workshop equipment required |
t
| Double ladder, e. g. -VAS 5085 - |
t
| Pliers for spring strap clamps |
l
| Fit engine and gearbox using engine mount to the engine/gearbox jack. |
Installation is carried out in the reverse order. Pay attention to the following: |
Caution When undertaking all assembly work, particularly in the engine compartment due to its cramped construction, please observe the following: |
t
| Lay lines of all kinds (e.g. for fuel, hydraulic fluid, the active charcoal container-unit, cooling fluid and refrigerant, brake fluid, vacuum) and electrical lines in such a way that the original line guide is re-established. |
t
| In order to avoid damage to the cables, ensure that there is adequate free access to all moving or hot components. |
|
Note t
| All cable straps should be fitted on again in the same place when installing. |
t
| When performing installation work replace the self-locking nuts and screws. |
t
| Replace screws which have been tightened to a torquing angle as well as gasket rings and seals. |
Observe all safety measures and notes for assembly work on the fuel, injection and ignition system and the charge air system as well as rules for cleanliness → Chapter. |
|
|
|