Installation is carried out in the reverse order. Pay attention to the following: |
–
| All cable straps should be fitted on again in the same place when installing. |
–
| When performing installation work replace the self-locking nuts. |
–
| Replace all the gaskets. |
–
| The thread of the lambda probe must be greased with hot screw paste -G 052 112 A3-. The paste must not come into contact with the slots of the probe body. |
|
|
|