–
| Slacken the fixing screws -arrows- crosswise and carefully remove the intake manifold upwards. |
Note Pour the residual coolant out of the charge air cooler into a collecting tank. |
Installation occurs in reverse order to removal. |
Tightening torque of fixing screws for intake manifold: 20 Nm |
Tightening torque and tightening sequence for charge-air cooler: |
–
| Check, top up and bleed cooling system → Chapter. |
|
|
|