smart Workshop Repair Guides

Smart Workshop Service and Repair Manuals

AH98.00-P-0001-01SM Notes on paintwork care|Page 2932 > < AH98.00-P-0001-01SM Notes on paintwork care|Page 2930
Page 2
background image

4

Body flange 

5

EP filler 

6

Base coat and clear varnish 

7

Adhesive (following application) 

A Bonding surface

Paint the bonding surface (A) only with EP filler (5). After applying the adhesive material (7) ensure that the bonding surface (A) is covered 80 %.

Drying process

If no information on the inlet temperature and drying times are available from the paint manufacturers, use the following specifications.
Inlet temperature: 72 °C (for 60 °C object temperature)
Drying time:
EP filler

90 minutes

Base coat

60 minutes

Clear coat

90 minutes

After installing the windshield or roof paneling, the EP filler (5) should be covered with adhesive material (7). Ensure that the side subject to weathering
is always completely covered with adhesive material to ensure proper corrosion protection (7).

AH98.00-P-0001-01SM Notes on paintwork care|Page 2932 > < AH98.00-P-0001-01SM Notes on paintwork care|Page 2930