ForTwo L3-1.0L (2009)
4
Body flange
5
EP filler
6
Base coat and clear varnish
7
Adhesive (following application)
A Bonding surface
Paint the bonding surface (A) only with EP filler (5). After applying the adhesive material (7) ensure that the bonding surface (A) is covered 80 %.
Drying process
If no information on the inlet temperature and drying times are available from the paint manufacturers, use the following specifications.
Inlet temperature: 72 °C (for 60 °C object temperature)
Drying time:
EP filler
90 minutes
Base coat
60 minutes
Clear coat
90 minutes
After installing the windshield or roof paneling, the EP filler (5) should be covered with adhesive material (7). Ensure that the side subject to weathering
is always completely covered with adhesive material to ensure proper corrosion protection (7).